TO: Mayor and City Councilmembers
FROM: Scott Miller, Public Works Director / Airport Manager
SUBJECT:
title
Public Monthly Activity Summary, September
end
RECOMMENDED COUNCIL ACTION:
recommendation
No Action Required. Informational Only.
body
SUMMARY:
The attached information is summary of notable tasks that the Public Works Department has completed during the preceding month of September.
PREVIOUS COUNCIL ACTION:
None.
DISCUSSION:
In addition to normal daily operations, the following are specific notable items completed by each Division in the Public Works Department. Staff also participated in monthly safety training.
STREETS
12 tons of road patch placed
14 tons of hot mix asphalt patches placed
7 city blocks of trees trimmed and 12 stumps ground
15 man-hours of storm drain clearing
40 man-hours of Main Street clean up in preparation to Beef and Brew
90 man-hours of street marking painting
Assisted with submerged tree removal at boat dock/ramp
PARKS
4 parks edged and trimmed, and 8 park trees trimmed
5 restrooms painted, 1 door latch replaced
Placed decorative fill material in 5 parking lot planters
4 sprinklers replaced, 1 faucet replaced, and performed 2 irrigation repairs
ELECTRICAL
Multiple days of repairs at damaged Str. Mary Columba traffic signal
Converted Rio/Hickory Parking lot lighting to LED fixtures
Replaced traffic signal at So. Main and Diamond Streets
Inspection and bulb replacements at airport
Replaced lighting timer at Diamond Park
Conducted multiple service calls in various city facilities
FLEET
Performed 13 oil changes on 11 vehicles and 2 pieces of equipment
35 repairs on 16 vehicles and 19 pieces of equipment
Completed 7 90-day inspections
2 trucks tested for Clean Truck program
Worked on auction preparation, item descriptions, and staging of items
SEWER COLLECTIONS
Staff participated in off-site training with CWEA
Bucked up, removal, and hauling of sludge pond solids from WWTP
Preventative maintenance and vacuuming of ...