Title: Public Works Monthly Activity Summary, October
Date Ver.Action ByActionResultAction DetailsMeeting DetailsAudio/Video
No records to display.

TO:                                          Mayor and City Councilmembers

 

FROM:                     Scott Miller, Public Works Director / Airport Manager

 

SUBJECT:
title                     

Public Works Monthly Activity Summary, October

end

 

RECOMMENDED COUNCIL ACTION:

recommendation

No Action Required.  Informational Only.

body

 

SUMMARY:

The attached information is a summary of notable tasks that the Public Works Department has completed during the preceding month of October.

 

PREVIOUS COUNCIL ACTION:

None.

 

DISCUSSION:

In addition to normal daily operations, the below are specific notable items completed by each Division in Public Works Department.  Staff also participated in monthly safety training and attended a conference of California airports.  Various PW staff assisted RBPD in traffic control duties for the annual Monster Truck event.  All Divisions reviewed their respective Emergency Response Plans/Protocols in preparation of predicted El Niño season.

 

STREETS

•                     10 blocks of tree trimming

•                     24-manhours of vegetation management

•                     Applied 7 tons of road patch in potholes

•                     120-man hours of storm drain clearing

•                     Replaced 8 Street Signs

•                     110 man-hours of Holiday banner change-out and trimming downtown trees, including hanging Holiday lights

•                     62 man-hours building maintenance/repairs at Airport, sidewalks, RBPD

PARKS

•                     Edged and trimmed 5 parks and 2 trees

•                     Painted 4 restrooms and 32-man hours of River Park restroom repairs

•                     Replaced/repaired 3 irrigation valves and lines, 5 sprinklers, and 3 door latches, 1 drinking fountain, 1 hose bib, 4 toilet paper holders, 1 toilet

ELECTRICAL

•                     Inspected and repaired wiring for downtown Holiday lights and Christmas tree site

•                     Rewired and installed new lights at FAA office building

•                     Replaced exhaust fan in RBPD

•                     Coordinated and assisted with temporary repairs of traffic control computer equipment damaged from vehicle collision at Sister Mary Columba Drive

•                     On 10/30/2026, Ken Garner retired after more than 30 years of Dedicated Service to the City!  We wish him well and hope that he fully enjoys the well-earned retirement!

FLEET

•                     Performed 9 oil services on 8 vehicles and 1 piece of equipment

•                     19 repairs on 13 vehicles and 6 pieces of equipment

•                     Prepped arrow board trailer and truck for Monster Truck traffic control

•                     Coordinated auction preview, sale, and pick up of surplus City equipment and items that grossed approximately $216,700 in total sales, after fees the City collecting $193,000

SEWER COLLECTIONS

•                     Rodded and flushed 4.0 miles of sewer mains

•                     Replaced rod spool on rodder trailer

•                     De-ragged Riverside lift-station pumps and repaired level probe

•                     Continued servicing and pumping behind Thai House

•                     Assisted Streets Division with multiple street sign excavations with Vac-Truck

•                     Pulled lids and conducted inspections on 360 SSMH’s

•                     43 USA markings requests and several contractor tie-in observations/inspections

•                     Conducted a half-day ride-along Collections orientation with a Council Member

 

WASTE WATER TREATMENT PLANT

•                     Treated 31.1 million gallons of influent

•                     Discharged 26.2 million gallons of treated effluent

•                     Sludge removed from drying beds and transported to Land Fill

•                     Vibration analysis performed on all critical equipment

•                     Removed multiple hazardous trees around drying beds

•                     Two removed Aeration Blower and Digester Aerator motors still in shop for rewind/rebuild

•                     Conducted preventative inspections and maintenance on,

o                     Primary Clarifier - multiple de-ragging of pumps

o                     Grit Blower belt alignment inspected

o                     Aeration Blowers - rotated, intake filters replaced, laser aligned

o                     Aerobic Digester - 2 motors removed and sent for bearing replacement

o                     Secondary Clarifier - washed (x16) & inspected weirs, chlorine ring, and outfall

o                     Mechanical Bar Screen inspected, de-ragging, cleaned, and lubricated

o                     Return Activated Sludge pump’s cooling fan replaced

o                     SBS Tank - new level transmitter installed

o                     Tertiary filter cleaned and inspected, Traveling Bridge drive inspected

WATER

•                     Repaired 6 water main leaks

•                     Conducted 17 water quality samples

•                     Performed 5,093 water meter reads and 19 turn off/ons

•                     Responded to 64 utility locating requests and 3 contractor inspections/meetings

•                     Exercised 66 water main valves

•                     Flushed and/or conducted preventative maintenance on 37 fire hydrants and painted 17

•                     Replaced 2 valves and 52 Smart-meters

•                     Responded to 24 Work Orders

•                     68 man-hours of well maintenance and conducting emergency preparedness services

ENGINEERING

•                     Issued 5 Encroachment Permits

•                     Conducted 20 private development plan checks

•                     Processed 3 Requests for Connection to City Services for County parcels

•                     Managed/coordinated 10 PW projects in the design/planning/construction phase, including Pine and Madison intersection repair and proposed So. Jackson Lift Station

•                     Multiple inspections at public and City projects

•                     Responded to public inquiries (phone, email, front counter), including Public Record Requests and issued 10+ Work Orders

•                     Regulatory compliance updates for industrial and stormwater collection/discharge monitoring/reporting

•                     Coordinated Gov. Building maintenance/repairs at City Hall, Airport, River Park, and damaged traffic Signal at Sister Mary Columba Drive

•                     Provided support and data in assistance with grant applications and Measure S Committee

•                     Attended Tehama County Disaster Council meeting for coordinated regional preparation of predicted El Niño season

 

CITY FISCAL IMPACT:

Impact varies depending on the Department’s Division funding.  Generally, costs associated with the summary items are covered by budgeted operational funding or project specific budget accounts.

 