Title: Public Works Monthly Activity Summary, August

TO:                                          Mayor and City Councilmembers

 

FROM:                     Scott Miller, Public Works Director / Airport Manager

 

SUBJECT:
title                     

Public Works Monthly Activity Summary, August

end

 

RECOMMENDED COUNCIL ACTION:

recommendation

No Action Required.  Informational Only.

body

 

SUMMARY:

The attached information is a summary of notable tasks that the Public Works Department has completed during the preceding month of August.

 

PREVIOUS COUNCIL ACTION:

None.

 

DISCUSSION:

In addition to normal daily operations, the following are specific notable items completed by each Division in the Public Works Department.  Staff also participated in monthly safety training.

 

STREETS

•                     6 blocks of tree trimming

•                     80-manhours of stump-grinding

•                     Applied 6.5 tons of road patch in potholes

•                     60-man hours of street striping and 16-man hours of flagging with TCPW on Baker Rd.

•                     Replaced 4 Street Signs

•                     256-man hours building maintenance/repairs and fire (vegetation) mitigation

PARKS

•                     Trimmed 16 trees and 5 stumps were ground

•                     Painted 4 restrooms, replaced 4 TP holders, repaired 1 drinking fountain

•                     Replaced/repaired 7 sprinklers and 2 irrigation lines

•                     1,240 feet of park gutters cleaned up and 1 sign repaired

ELECTRICAL

•                     No update

FLEET

•                     Performed 18 oil services on 16 vehicles and 2 pieces of equipment

•                     26 repairs on 20 vehicles and 6 pieces of equipment

•                     Performed 2 90-day truck inspections and 2 trucks tested for Clean Truck program

•                     Coordinated State inspections of all City owned PERP registered portable equipment

•                     Continued coordination of items and contacts for surplus equipment auction including staging of equipment

SEWER COLLECTIONS

•                     Rodded and flushed 1.5 miles of sewer mains

•                     Replaced pump at Orleans LS and fluid level sensor and pump at Motel 6 LS

•                     De-ragged Riverside LS and emergency vacuuming of cooking oil dumping at Denny’s

•                     Continued daily servicing of blocked sewer main behind Thai House

•                     Assisted Parks staff with irrigation line locations

•                     Conducted repairs on Vac-Truck and Rodder trailer

•                     78 USA markings requests and several contractor tie-in observations/inspections

 

WASTE WATER TREATMENT PLANT

•                     Treated 27.0 million gallons of influent

•                     Discharged 21.3 million gallons of treated effluent

•                     Sludge drying beds; one has been mixed and turned over

•                     Kickboard replaced around grit chamber and primary clarifier

•                     Conducted preventative inspections and maintenance on,

o                     Primary Clarifier - new control box installed and drive cleaned, inspected, de-ragged, & lubricated

o                     Grit Chamber drained, inspected, residual grit measured, & blower aligned

o                     Secondary Clarifier - washed & inspected weirs, chlorine ring, and outfall

o                     Mechanical Bar Screen inspected, de-ragging, cleaned, and lubricated

o                     Aerobic Digester support cables de-ragged and damaged portions replaced

o                     CL2 Analyzers flushed and calibrated

o                     Tertiary filter cleaned and inspected, backwash pump & primary drive serviced

WATER

•                     Repaired 6 water main leaks

•                     Conducted 22 water quality samples

•                     Performed 5,021 water meter reads and 22 notices delivered

•                     Responded to 94 utility locating requests

•                     Exercised 215 water main valves and replaced 1

•                     Flushed and/or conducted preventative maintenance on 176 fire hydrants and painted 20 more

•                     Replaced 169 Smart-meters

•                     Responded to 20 Work Orders and 3 contractor meetings/inspections

ENGINEERING

•                     Issued 16 Encroachment Permits

•                     Conducted 21 private development plan checks

•                     Managed/coordinated 12 PW projects in the design/planning/construction phase

•                     Splash Park rebid and Trainor Park play structure coordination

•                     Provided technical assistance/maintenance/installation on HVAC, IT, phones, & cameras

•                     Multiple inspections at Palms Villas and Rio Street Sewer construction projects

•                     Responded to public inquiries (phone, email, front counter), including Public Record Requests and issued 15 Work Orders

•                     Regulatory compliance updates for industrial and stormwater collection/discharge monitoring/reporting

•                     Coordinated Gov. Building maintenance/repairs at City Hall, Airport, River Park

•                     Ongoing response to an emergency blockage in sewer main behind Thai House

•                     Provided support and data in assistance with grant applications

 

 

CITY FISCAL IMPACT:

Click or tap here to enter fiscal impact summary.

 

ATTACHMENTS:

1.                     None